Prepare to install

When you have ordered an s-kiosk, preparation to install involves a few important steps:

1 Conduct a site survey.
Ensure that the installation site meets all necessary requirements.

2 Install and pull necessary cabling.
Proper electrical wiring and Ethernet

3 Cast a concrete slab,
High quality concrete

4 Set up user access.
Dashboard interface in browser.

Scope
After order confirmation, it is necessary to prepare to install the kiosk.

Appendix: HSE & Legal

5 Connectivity,
Verify firewall settings